A company's concentrator has an annual processing capacity of 10 million tons of magnetite and 3 million tons of iron concentrate. The main process of the concentrator is composed of several production links such as coarse crushing, storage pile, medium and fine crushing, screening room, dry separation room, grinding, magnetic separation, flotation, concentration and other public and auxiliary facilities.
The main contents of the construction and implementation of the automation system include the design, supply, installation, commissioning of the three electric integration (I & C, computer control system, electric control) of the ore crushing, ore washing and screening, grinding, flotation and dewatering, tailings transportation and other systems, as well as the industrial television monitoring and large screen system.